How are you? Are you starting to be excited, now that the moving date is known and is fast approaching?


For the construction team, the sprint is on! As part of site meetings, we talk more and more taking possession of real property and your back! We look forward to seeing you again, even though we know that the next weeks will be busy!


As evidenced by the photo of introduction, installation of the siding is going well ... Do not you think that the blocks of terra cotta blend in nicely with autumn leaves? No need to go live in the Laurentians for the "magic color", just go through Pointe-aux-Trembles!

Edwards Chocolate Creme Pie Recipe

13 745 Street 13 755

This building is still our "small final", but work there is proceeding apace. All the floors were leveled and are ready for the new coating. Installing kitchen cabinets is supplemented in most homes the 3rd floor. Once this operation is completed, the new flooring will be installed. The bathrooms are almost all completed.

Eye Toy Driver For Webcam

Forsyth Street

The housing work is nearly complete, but much remains to be done in the common areas and the start of mechanical systems such as ventilation system, intercom system, and fire detection system which we must bring the latest patches. He must also complete Construction of storage space in the basement.

Marilyn Chambers Streraming Behing The Green Door

13 765 Forsyth Street

work remains to be done to address are the same as 13 755, rue Forsyth: finish in the accommodation, the start of mechanical systems and work in common areas . Here's what to expect in the coming weeks:

1. The general contractor will complete work in all homes.
2. It will make a full household of each unit.
3. OMHM team, accompanied by professionals, will visit all homes and note the defects remaining to correct.
4. The contractor will correct the deficiencies.
5. When corrections are made to the satisfaction of the OMHM, we change the lock housing and is ready to be reinstated.


This process does not happen overnight, but we are confident of being ready in time to greet you. Alongside these interventions in the housing, the contractor completes the work and advance in the common areas and outside.

Can Chemotherapy Shrink A Tumor Completely

13 775 Forsyth Street

In this building, the installation is complete for: flooring, the kitchen cabinets, ceramic in bathrooms, the hanger bars (pins) and shelves in the closet. The painting will be completed in the coming days ... whose accent color is blue for this building.

Seat Alhambra Diagnostics Plug In

13 687 Forsyth Street Forsyth

Last week, the kick-off meeting was held for the construction of the tower. The general contractor has met the team of professionals. In addition, we began cleaning up the items left by former tenants and demolition should begin in the coming weeks.