Since early December 2010, several of the 72 families who will move into the three-story buildings were installed. On 13 December a meeting was organized with these families, who were satisfied with the quality of spaces and finishes of their home. Meanwhile, several tenants have expressed interest in seeing more photos showing the construction of their home.

response to their request, here are some more pictures to explain the stages of construction of kitchens and bathrooms.


Happy reading!

Matching Colors Walls For A Green Carpet

Steps Building Steps kitchen


1. Installation of the main ducts of the plumbing and ventilation, followed by the installation of metal studs used to delineate the position of partitions.






2. Insulated air ducts and plumbing fitting to the main ducts. We can then install drywall around the ducts. Also included parts of gypsum with sealant fire (red seal on the picture). The ductwork needs to be very airtight to prevent the passage of smoke in case of fire.



3. Covering walls with gypsum. Between sections of drywall, fill joints with plaster. Then you can paint the walls and install vinyl slats to the floor.






4. Installation of equipment such as countertops, cabinets, sink, range hood, and light fixtures. One of the concepts behind the renovation of housing was to expose as much as possible the ceiling and the concrete column. This allows among others to limit the materials capable of storing moisture. However, concrete kitchen has many flaws due to the original building, which gave us the idea install a corkboard for camouffler and give a more handy at this room!

Tuesday, January 18, 2011

Predict The Molecular Structure For H2se

construction of bathroom

The four steps outlined for the construction of the kitchen are also valid for the bathroom, except that gypsum is green. This feature confirms that the Gypsum is waterproof and specially designed to withstand moisture more abundant the bathroom (see photo in step 3).

1. Plumbing pipes and ventilation are apparent.












2. Gypsum covers the ventilation duct.









3. Sections of gypsum are sealed and the bathroom is ready to receive finishing materials.











4. Among the characteristics of the bathroom are:

> ventilation which operates continuously (24 h/24). This means that no operation is needed to start, since the motor is on the roof and eradicates humidity bathroom at all times. The exhaust air is compensated by the addition of new air coming in through the vents in rooms housing.

> A ceramic floor large format to address up to date and publish the larger space.

> A vanity mounted on legs to limit the damage if water is found on the ground. The maintenance of the floor will certainly be easier because of this feature as well.