1. Installing speakers decontamination and discharge planning of contaminated waste. The solution was to build two outdoor shelters which is sealed in a container that collects waste materials contaminated with mold and asbestos.
2. Using water-pressure machines, the Contractor shall remove the finish and decorative coating of cement ceilings that contain asbestos. It is an innovative solution, which does not fail, however, reject a lot of water on the floor ... which then flows on the floor below.
3. Therefore, the third step is to collect the water using large plastic sheeting installed over the waterproof surface of the floor downstairs.
4. Once the water recovered, it is filtered and reused in the pressure washer will be used to remove the coating of another asbestos ceiling. All these operations can achieve a smooth concrete ceiling, very clean and most importantly, free of asbestos. The interior demolition, decontamination and removal of asbestos should continue on the remaining five floors until June 2011.